top of page
Blog
All Posts


Case Study: Brooklands Primary School, EYFS Redevelopment – Nottingham
Absolute Play completed a full EYFS redevelopment at Brooklands Primary School, transforming the outdoor area with new surfacing, climbing equipment, and sand and water play zones.
Absolute Play
Feb 283 min read


Case Study: Alderman Pounder Primary School – Playground Surfacing Transformation, Nottingham
Absolute Play completed new playground surfacing at Alderman Pounder Primary School, Nottingham, installing artificial grass and resin bound gravel to create a clean, all-weather play space.
Absolute Play
Feb 283 min read


Case Study: Ripple Primary School – MUGA Installation, Barking and Dagenham
Absolute Play completed a full MUGA install at Ripple Primary School, Barking and Dagenham, featuring new tarmac surfacing, rebound fencing, integrated goals and thermoplastic markings.
Absolute Play
Feb 283 min read


Case Study: Belsay Primary School – EYFS Sensory Play Space Redevelopment, Newcastle upon Tyne
Absolute Play delivered a unique EYFS sensory play area at Belsay Primary School, Newcastle upon Tyne, featuring a resin bound sensory trackway, sand-blend wetpour and water play.
Absolute Play
Feb 283 min read


Case Study: Three Lane Ends Academy – EYFS Play Area Development, Castleford
Absolute Play created a vibrant new EYFS play area at Three Lane Ends Academy, Castleford, featuring a Sunflower Tower Unit, artificial grass surfacing and a thermoplastic trackway.
Absolute Play
Feb 283 min read


Case Study: Eversley Primary School – KS2 Trim Trail Installation, Enfield
Absolute Play installed a new KS2 trim trail at Eversley Primary School, Enfield, replacing unsafe equipment with a challenging climbing and fitness area finished with bonded rubber mulch surfacing.
Absolute Play
Feb 283 min read


Case Study: Priory Common School – KS2 Climbing and Fitness Zone Installation, Milton Keynes
Absolute Play created a new fitness zone at Priory Common School, Milton Keynes, featuring a Clamber Stack Mezzo, outdoor gym equipment and safer impact surfacing for KS2 pupils.
Absolute Play
Feb 283 min read


Case Study: Rivendell Academy – KS1 & KS2 Trim Trail Installation, Nottingham
Absolute Play delivered a new KS1 & KS2 trim trail at Rivendell Academy, Nottingham, transforming an empty space into a challenging climbing and fitness area with artificial grass safety surfacing.
Absolute Play
Feb 283 min read


Case Study: St Vigor & St John Church School – MUGA Refurbishment, Chilcompton
Absolute Play completed a full MUGA refurbishment at St Vigor & St John Church School, Radstock, installing a new anti-slip sports coating, macadam surface and thermoplastic markings.
Absolute Play
Feb 283 min read


Case Study: Haddon Primary School – Outdoor Fitness and Trim Trail Installation, Nottingham
Absolute Play completed a new trim trail installation at Haddon Primary School, Nottingham, creating a dedicated outdoor fitness space with gym equipment and all-weather safety surfacing.
Absolute Play
Feb 282 min read


Case Study: Orchards Junior School – Full Sports Facility 4G MUGA Install, Worthing
Absolute Play delivered a full 4G MUGA install at Orchards Junior School, Worthing, creating a professional all-weather sports facility with rebound fencing, integrated goals and thermoplastic court markings.
Absolute Play
Feb 282 min read


Case Study: The German School – Multi-Sport Court and Long Jump Installation, Richmond
MUGA refurbishment at Brownlow Fold Primary School, Bolton, featuring anti-slip sports coating and thermoplastic markings to restore the sports court.
Absolute Play
Feb 282 min read


Case Study: Brownlow Fold Primary School – MUGA Sports Coating Refurbishment, Bolton
Absolute Play revitalised the MUGA at Brownlow Fold Primary School, Bolton, using anti-slip sports coating and thermoplastic court markings to transform the tired surface into a vibrant sports space.
Absolute Play
Feb 282 min read


Case Study: Foxes Piece School – 2G MUGA Installation, Marlow
Absolute Play completed a compact MUGA installation at Foxes Piece School, Marlow, featuring 2G artificial turf, rebound mesh fencing and integrated goals to create a durable, all-weather sports space.
Absolute Play
Feb 282 min read


Case Study: Holy Rood Catholic Primary School – MUGA Redevelopment, Swindon
Absolute Play completed a full MUGA redevelopment at Holy Rood Catholic Primary School, Swindon, transforming an old, unused court into a vibrant, low-maintenance sports facility with new tarmac, fencing and markings.
Absolute Play
Feb 282 min read


Case Study: Horsendale Primary School – 2G MUGA Surface Replacement, Nottingham
Absolute Play completed a full 2G MUGA surface replacement at Horsendale Primary School, Nottingham, transforming a tired and worn pitch into a safe, vibrant and cost-effective sports facility ready for a new generation of pupils.
Absolute Play
Feb 282 min read


Case Study: The West Park Academy – FS1 & FS2 Playground Redevelopment, Nottinghamshire
A full redevelopment of the FS1 and FS2 play areas, replacing outdated equipment with vibrant new spaces featuring climbing units, sand and water play, and durable surfacing.
Absolute Play
Feb 283 min read


Playground Development for Ks1 & KS2 - Peafield Lane Academy, Mansfield| Absolute Play - Case Study
See how Absolute Play delivered a full KS1 & KS2 Playground Redevelopment at Peafield Lane Academy, transforming a muddy, difficult-to-use playground into an engaging all-weather environment packed with climbing, active play and durable surfacing.
Absolute Play
Feb 283 min read


Commercial Playground & Leisure Play Area Costs (UK)
Thinking about adding a playground to your leisure or visitor attraction – but not sure what it really costs?
This practical UK guide breaks down realistic commercial playground pricing, from small starter play areas to full destination playgrounds, and explains how timber, steel and recycled composite equipment compare. Designed for holiday parks, attractions, cafés and visitor venues, it shows what drives cost, how to plan in phases and how to create a play space that genui
Absolute Play
Feb 105 min read


Timber treatment for playground equipment – how our timber is protected for 15–20 years
Timber playground equipment needs more than just good design – it needs timber that is built to last. This guide explains how Absolute Play treats and engineers timber for outdoor use, and how our 15 and 20 year warranties help schools, councils and leisure sites invest with confidence.
Absolute Play
Feb 33 min read
bottom of page
