Case Study: Alderman Pounder Primary School – Playground Surfacing Transformation, Nottingham

📌 Project snapshot

  • Sector: Education

  • Age range served: KS1 & KS2

  • Key project drivers: Prevent mud and debris being transferred onto the main playground, improve cleanliness across the site, and transform an underused shelter area into a practical, all-weather play space.

  • Equipment type: Surfacing Led Scheme

  • Surfacing: Artificial grass and Resin bound gravel

  • Budget: £20-25k


Playground Surfacing

Project summary - Playground Surfacing

This project focused on resolving a long-standing issue with mud and debris being carried from soft landscape areas onto the main playground, while also unlocking the potential of an underused shelter space.

Through the installation of durable, all-weather surfacing, we were able to significantly extend the usable play area and create a cleaner, more functional outdoor environment for pupils.

old playground
The Space before

The brief

The existing grass and loose surfaced areas became muddy during wet weather, making them unusable for much of the year and causing mud to be walked into other areas of the playground and school buildings.

The school needed a solution that would:

  • Prevent mud transfer and improve overall cleanliness

  • Create a usable, all-weather surface beneath the shelter

  • Extend the practical play space available

  • Improve the overall appearance of the playground


Our solution

Our solution focused on replacing problematic surfaces with durable, free-draining materials while carefully integrating the new areas with the existing playground. By combining resin bound gravel beneath the shelter with artificial grass surrounding it, we created a seamless transition between spaces and maximised usability throughout the year.

Playground Surfacing
  • Key elements:

    • Installation of resin bound gravel beneath the shelter, creating a clean, accessible and all-weather space

    • Installation of play-grade artificial grass, connecting the area to the main playground

    • Full excavation and installation of new MOT Type 1 sub-base

    • Timber sleeper edging, neatly defining trees and planting areas

    • Block edging, ensuring clean, durable transitions between surfaces

Playground Surfacing
  • Design approach:

    The design focused on solving the root cause of the mud transfer while making the most of the existing footprint.


    By introducing resin bound gravel beneath the shelter, the space has been transformed into a practical, year-round usable area. Artificial grass was then used to seamlessly connect this space with the surrounding playground, creating a cohesive and visually appealing finish. Careful detailing around trees and planting areas ensured these features were retained while improving overall durability and maintenance.

Playground Design

Materials & surfacing

High-quality, low-maintenance materials were selected to ensure long-term performance.


This included:

  • Resin bound gravel for durability, permeability and clean appearance

  • Premium play-grade artificial grass for all-weather usability

  • New stone sub-base to ensure structural integrity

  • Timber and block edging to provide clean, defined finishes


These materials significantly improve usability while reducing ongoing maintenance.


Installation

The project included removal of all existing unsuitable surfaces, including worn artificial grass, carpets and rotten timber edging.

New foundations, surfacing and edging were then installed to create a robust and long-lasting solution.

The works were completed efficiently, delivering a complete transformation of the space.


The outcome

The completed project has transformed an underused and problematic area into a clean, vibrant and fully usable outdoor space.

Mud and debris transfer has been eliminated, improving cleanliness across the playground and school.

Most importantly, the space beneath the shelter is now a valuable, all-weather extension of the playground, providing additional opportunities for play and outdoor learning.

This project demonstrates how thoughtful surfacing design can completely transform the functionality and usability of an existing playground.

Playground Surfacing
Playground Surfacing

Client feedback

"The team have been great, it has been an unbelievable transformation."

Mr Butterworth-Drury - Headteacher