top of page

Our Projects

From complete playground developments to smaller enhancements, our team has designed and installed a wide range of projects across England. We’ve delivered everything from large-scale play areas and bespoke timber structures to shelters, seating, safety surfacing, and vibrant playground markings. Whether it’s a full outdoor transformation or a single feature, each project is tailored to meet the needs of the setting, combining creativity, quality, and expert craftsmanship every step of the way.

Manor House School

Leatherhead KT23, UK

What a fun project! The brief was COLOUR! How incredible does this colourful Shelter and exciting Wet pour design looked!

Mount Pleasant Primary School

Huddersfield, UK

A truly WOW Factor Project! This Scheme had it all! From a full playground resurface, to a fantastic nautical theme kit selection. It really embodies a well rounded design. We were blessed to work with this school who had a really clear vision of what they were trying to achieve, and we were delighted to bring their vision to life!

A Few key features include:
- A Batten down the hatches play Ship with endless physical and imaginative play opportunities
- A Log Climber
- 2 Timber Tipi's
- A Low Level Trim Trail
- A Forest Hut for quiet time
- Den Making Posts
- A Performance Stage with seating
- Surfacing: Artificial grass, Wetpour, coloured Tarmac, Thermoplastic markings, a running track

This scheme really does deliver, meeting requirements for sports and fitness too through the use of the running track and carefully selected thermoplastic markings. What a truly magical space for playtime!

Margaret McMillan Primary School

Bradford, West Yorkshire, UK

A Redevelopment of the main playground. Out with old and in with the new. Featuring, a huge performance area, Climbing equipment - clamber stack and trim trail items. A Climbing Den, a pyramid climber as well as artificial grass and a selection of exciting thermoplastics!

Holme Community School

Carnforth LA6, UK

A Lovely little EYFS development. For this scheme we removed the old rotten equipment along with the old bark surfacing and using the same footprint installed new physical play equipment and artificial grass. Featuring a Clamber Stack Midi with Slide and EYFS Trail items

John King Infant Academy

Pinxton, Nottingham, UK

This scheme developed from the requirement to repair edges. We replaced the edging to create a raised sleeper edge area for messy play and we effectively used low level trail items to create a soft divide between the two surfaces, all tied in with a new wetpour edge.

Longwood Infant Academy

Pinxton, Nottingham, UK

At Longwood Infant the school the brief was to create a quiet sheltered space that was bright and airy and offered flexible seating options. The delivered scheme really ticks all their boxes and truly provides a stunning focal point in the playground.

Roose Primary School

Barrow-in-Furness, UK

A mixed project. We revamped both the main playground and also the main school field. A variety of exciting thermoplastic markings brought the main playground to life. The top field an EYFS multi unit and a trim Trail - to suit all abilities

The German School

Richmond TW10, UK

A Fantastic MUGA Surface Installation. Featuring a new Tarmac Sports Court complete with a painted green sports coating and thermoplastic line markings. We also supplied and installed a long jump Pit.

Eversley Primary School

Enfield, UK

A Simple EYFS upgrade! We added a new wetpour surface and a neat EYFS tower unit featuring a slide and climbing wall.

Bannerman Road Community Primary School

Bristol, UK

A Clamber Stack 2 installed onto tarmac with a Black wetpour safety surface

  • Facebook
  • Instagram
bottom of page