top of page
Blog


Sensory EYFS Playground - Roose Primary School, Barrow-in-Furness | Absolute Play - Case Study
Discover this EYFS Playground Design and Install at Roose Primary School, transforming a tired, poorly draining outdoor space into a vibrant Early Years environment packed with sensory play, messy play, water play and outdoor learning opportunities.
Absolute Play
May 263 min read


EYFS Playground Design and Install - Peafield Lane Academy, Mansfield | Absolute Play - Case Study
Discover this EYFS Playground Design and Install at Peafield Lane Academy. Featuring climbing equipment, sand and water play, mud kitchens, sensory surfacing, outdoor learning spaces and natural Early Years playground design.
Absolute Play
May 263 min read


Case Study: Littleton C of E Infant School – Nursery Playground Redevelopment, Shepperton
Absolute Play completed a new Nursery playground at Littleton Infant School, Shepperton, featuring a Clamber Stack, sensory surfacing, sand and water play, and artificial grass.
Absolute Play
Mar 13 min read


Case Study: Belsay Primary School – EYFS Sensory Play Space Redevelopment, Newcastle upon Tyne
Absolute Play delivered a unique EYFS sensory play area at Belsay Primary School, Newcastle upon Tyne, featuring a resin bound sensory trackway, sand-blend wetpour and water play.
Absolute Play
Feb 283 min read


Case Study: Three Lane Ends Academy – EYFS Play Area Development, Castleford
Absolute Play created a vibrant new EYFS play area at Three Lane Ends Academy, Castleford, featuring a Sunflower Tower Unit, artificial grass surfacing and a thermoplastic trackway.
Absolute Play
Feb 283 min read


Case Study: The West Park Academy – FS1 & FS2 Playground Redevelopment, Nottinghamshire
A full redevelopment of the FS1 and FS2 play areas, replacing outdated equipment with vibrant new spaces featuring climbing units, sand and water play, and durable surfacing.
Absolute Play
Feb 283 min read
bottom of page
